[20/04/2009]
HISTORY OF
KALREZ WIRELINE DIVISION
In the year
2007, Kalrez Management decide to build Wireline Division using
Wireline Unit, Tools & Equipments from Prakarsa Pramandita, PT. An engineering team was
build consists of Mr. Yiyis Purosani, Mr. Nurdi, and Mrs. Silvia
Angraeni.
Then Kalrez use PT.EPI as consultant to make an inspection
for any requirement and proper maintenance.
One senior wireline engineer from EPI was sent to Bula to
collecting, prepare and test logging equipments.
After complete the all things as EPI recommendations, then
Kalrez performed leader team to follow Logging training, both open
hole and cased hole matters. First Field Logging training was in
25S-5 well (Cased Hole).
Perforation training conducted in real well at 79D-1, Bula Lemon
Field. The well was flowing with oil & gas. This phenomenal well
produced until maximum 65 BOPD from initial production that only
5 BOPD.
Finally, at April 2008, Kalrez decided to hire a wireline
engineer to handles Kalrez Wireline Unit, names Mr. Ghiorso HS
and a wireline operator names, Mr. Iwan Hanafi.
|